Emergency Drilling Works at Tonsley
Bench Directional Drilling & Civil helped replace a collapsed main inside one of the Tonsley TAFE classrooms. Emergency works were required to remediate the stormwater via directional drilling. Floor had been removed, concrete removed, 450mm grade stormwater, with a graded drill. Bypassed the damaged main.